Packaged MBR sewage treatment plant, skid-mounted

Solution

Packaged and Prefabricated Sewage Treatment Plants

Skid-mounted and containerised MBR plants, built and tested in the factory.

From 10 to 500 KLD, ready to connect in about 8 to 16 weeks from order, with minimal civil work and in-house AEROFLO flat-sheet membranes. EPC, DBO and O&M.

10–500 KLDPre-engineered range; larger on a project basis
8–16 weeksTypical delivery from order
BOD ≤ 5 · TSS ≤ 5MBR treated water, turbidity below 1 NTU
450+ unitsPackaged MBR systems delivered

Overview

What is a packaged STP, and why build it in a factory?

A packaged sewage treatment plant is a complete, pre-engineered plant delivered as skids or containers. A prefabricated STP is one fabricated off site in modules and assembled at the location. SRPEPL's units are both: the screen, equalisation, biology, MBR (membrane bioreactor) and disinfection are piped, wired and tested in the factory, then delivered ready to connect. The pre-engineered range runs from 10 to 500 KLD, and larger plants are engineered per project, often as several modules.

The reason to choose one is speed and certainty. Civil work shrinks to a foundation and connections, quality is checked under factory conditions instead of on a muddy site, and the plant is typically ready 8 to 16 weeks from order. The membranes replace the secondary clarifier, so the plant is compact and the treated water comes out with BOD and TSS of 5 mg/L or less and turbidity below 1 NTU, fit for flushing, gardening and other reuse.

10–500 KLD
Pre-engineered range
8–16 weeks
Typical delivery from order
450+
Packaged MBR units delivered
3–10 yr
DBO and annuity terms available

Treatment Train

How does a packaged MBR sewage treatment plant work?

Sewage passes a screen, is evened out in an equalisation tank, treated by bacteria in the anoxic and aeration zones, then drawn through submerged membranes and disinfected. Choose a capacity and a stage below. The lower panel shows what happens inside it, down to the particles.

50 KLD · Whole plant

Sewage and biomassTreated waterMixed liquor recycleAirSwipe the drawing sideways to see the whole plant.
Inside the stage
Capacity
Format (illustrative)
Treated water
Delivery

Schematic only. Pre-engineered units run from 10 to 500 KLD; the module count and layout shown here are illustrative and are fixed for each project from the flow, the site and the treated-water specification. Inflow curve, organic-load profile and UV doses are illustrative.

Choosing the Format

Packaged STP or a site-built plant: which is right?

Both can reach the same treated-water quality. The difference is in time, civil work, flexibility and the flow where each makes sense.

FactorPackaged and prefabricatedSite-built civil plant
Time to commissioningAbout 8 to 16 weeks from order for the pre-engineered rangeSet by the civil programme, and usually longer
Civil work on siteFoundation or hardstand and connectionsExcavation and construction of every tank
Quality controlFabricated, piped, wired and tested in the factoryBuilt on site, so it depends on site workmanship
FootprintCompact, with stacked or containerised layoutsSet by tank geometry and the available land
RelocationA skid or container can be moved if the site changesFixed once built
ExpansionAdd a module beside the firstNew civil works
Capacity10 to 500 KLD pre-engineered; multi-module above thatPractical for very large flows, in MLD
Best suited toCampuses, hotels, hospitals, townships, camps, remote and fast-track sitesCity-scale plants where land is available and flows are large

Choosing the process. MBR is the standard SRPEPL packaged format because it delivers reuse-grade water in a small footprint. Where the discharge norm is moderate and reuse is not planned, a simpler biology such as extended aeration or MBBR can be compared against it. SRPEPL's process team runs that comparison for the specific case rather than assuming MBR. For the full range of STP technologies, see the sewage treatment plant page.

Sizing

How do you size a packaged STP?

The plant is sized from the people it serves. Multiply the occupancy by the water use per person for the building type, take about 80% of that as sewage, and add a margin for growth and peaks. Try it below.

Water demand54 KLDOccupancy × litres per head
Sewage, about 80%43 KLDCommonly taken as 80% of supply
Design flow, 15% margin50 KLDFor growth and peak days

Indicative only. Per-person values follow the NBC and IS 1172 norms commonly used for design; confirm against the code edition and local bye-laws for your approval. Process engineers set the final size from the peak flow, the load and the treated-water target.

Sizing a packaged STP?

Send the occupancy or flow and the location. We will call you.

Name is required.
Enter a valid mobile number.
A valid email address is required.

Prefer to talk first? WhatsApp us

The Membrane

AEROFLO flat-sheet MBR membranes, made in-house

The membrane is the heart of a packaged MBR plant. SRPEPL's sister division, SRP Membranes, makes the AEROFLO corrugated PVDF flat-sheet membrane at Panchkula and Baddi, so the plant and its membrane come from one accountable source.

ItemAEROFLO specification
MembraneCorrugated PVDF flat sheet on a PET support board, with an independent channel for water collection
Nominal pore size0.1 µm
Thickness and weight1.6 mm thick, 0.84 kg per m²
Design effect of the corrugationLocal turbulence that resists fouling, and higher load-bearing capacity than conventional flat sheet
Energy10 to 15% lower than traditional flat membranes, per SRP Membranes data
Backwash flux15 to 30 L/m²·h
CleaningSodium hypochlorite and citric acid
ModulesFC-A-6 (9 m²), FC-B-6 (11 m²), FC-B-8 (15 m²), FC-C-6 (5 m²), FC-D-6 (7 m²)

Full datasheets are published at srpmembranes.com. Module choice and the number of modules in a plant are set from the design flux and the peak flow.

Applications

Where are packaged and prefabricated STPs used?

Residential townships

Apartment blocks and gated communities that need an STP with a small footprint and reusable water for flushing and gardens.

Hotels and resorts

Steady, high-quality treated water for landscaping and flushing, with the plant kept out of sight.

Hospitals and institutions

Campuses where uptime and clean, low-odour operation matter, and where treated water offsets a large demand.

Offices and IT parks

Commercial campuses that must show water-reuse performance as well as meet discharge norms.

Defence and paramilitary

Formations that need MES-grade specifications, security-cleared access and fast deployment.

Highways, railways and camps

Rest areas, stations and construction camps with no sewer, short timelines and shifting locations.

Industrial domestic sewage

Canteen and toilet sewage from factories, kept separate from process effluent.

Upgrades and capacity additions

An extra module beside an overloaded or ageing STP, or an MBR retrofit into an existing tank.

Delivery

From order to treated water in about 8 to 16 weeks

The saving comes from running the work in parallel: the foundation is prepared on site while the plant is built and tested in the factory. The exact programme depends on capacity, approvals and site readiness.

Design and approvals

Flow, load and treated-water target are fixed. Layout, process and utility needs are issued for approval.

Factory build and test

Tanks, screens, blowers, MBR modules, pumps and panels are fabricated, piped, wired and tested before they ship.

Transport and placement

Skids or containers are delivered to site and set on the prepared foundation, then connected to inlet, outlet and power.

Commissioning and handover

The biology is seeded, the membranes are brought on line, performance is verified and the operators are trained.

Scope and Contracts

What is included, and how can it be contracted?

A typical split is shown below. The exact scope is stated in the offer for each project.

SRPEPL scope, typically

  • Process design and general arrangement
  • Skids or containers with tanks, screen, blowers and pumps
  • AEROFLO MBR modules and permeate suction system
  • UV or chlorine disinfection
  • MCC and PLC control panel, instruments and piping
  • Factory testing, installation supervision, commissioning and operator training

Client scope, typically

  • Foundation or hardstand for the plant
  • Raw sewage inlet and treated-water outlet connections
  • Power supply and a drain for excess sludge
  • Statutory approvals and consents for the site

Contract models. SRPEPL supplies packaged plants on an EPC basis, and also under DBO and annuity contracts of 3 to 10 years where it designs, builds and operates the plant. Operation and maintenance contracts are available for plants SRPEPL has supplied and for existing plants, supported by five regional offices. See O&M and DBO services.

Track Record

450+ packaged MBR units delivered across India

SRPEPL has delivered more than 450 packaged MBR systems from 10 to 500 KLD for institutional campuses, defence formations, residential projects, commercial sites, construction camps and highway rest areas. Defence and AWHO installations are built to military engineering specifications with security-cleared access and fast-track commissioning. SRPEPL operates from Panchkula and Baddi manufacturing sites and holds ISO certifications.

Frequently Asked Questions

Packaged and prefabricated STPs: common questions

A packaged sewage treatment plant is a complete, pre-engineered treatment system built in a factory and delivered to site ready to connect. It holds the screen, equalisation, biological treatment, solids separation and disinfection in skid-mounted or containerised modules, so the work on site is mainly placement, piping, power and commissioning. SRPEPL packaged plants use an MBR (membrane bioreactor) process with in-house AEROFLO flat-sheet membranes.

The two terms overlap. Packaged usually means the plant is pre-engineered as a standard, complete unit. Prefabricated means the plant is fabricated off site in modules, such as skids or containers, and assembled at the location. The SRPEPL range from 10 to 500 KLD is both: pre-engineered sizes, fabricated and tested in the factory.

SRPEPL offers pre-engineered packaged STPs from 10 KLD to 500 KLD. Above 500 KLD the plant is engineered on a project basis, often as several modules in parallel, and can be combined with site-built tanks where that suits the flow and the land.

About 8 to 16 weeks from order for the pre-engineered range, depending on capacity, approvals and site readiness. The time is shorter than a site-built plant because fabrication and testing in the factory run alongside site preparation.

Minimal. The site usually needs a foundation or hardstand, the raw sewage inlet, the treated-water outlet, a power supply and a drain for sludge. There is no full tank construction, which is what saves the time. The exact civil scope is stated in the offer for each project.

The MBR output is BOD of 5 mg/L or less, TSS of 5 mg/L or less and turbidity below 1 NTU. With disinfection, this suits flushing, gardening, landscaping and similar reuse. If cooling-tower makeup, boiler feed or process water is the goal, a tertiary UF and RO stage can be added downstream.

No. The membranes replace the secondary clarifier and separate the biomass from the water directly. That is one reason the plant is compact, and why the treated water has such low suspended solids and turbidity.

Start from the occupancy and the water use per person for the building type, as set out in the NBC and IS 1172. Sewage is commonly taken as about 80% of the water supplied. Add a margin for growth and peaks, then choose the nearest pre-engineered size. The sizing calculator on this page gives a first estimate, and the SRPEPL process team confirms it against your site data.

Yes, within limits. Capacity can be added by installing another module alongside the first, and a skid or container can be moved if the site changes. Whether a specific unit should be expanded or relocated is checked against its hydraulics and layout.

The owner can run it with trained operators, or SRPEPL can operate it under an O&M or DBO contract. DBO and annuity terms run from 3 to 10 years, and five regional offices support plants after commissioning.

The cost depends on the capacity, the treated-water specification, the format (skid, container or multi-module) and the site. Send the flow or occupancy, the location and the discharge or reuse target with an enquiry, and the SRPEPL team will return an indicative scope and budget.

Sizing a packaged STP?

Send the occupancy or flow and the location. We will call you.

Name is required.
Enter a valid mobile number.
A valid email address is required.

Prefer to talk first? WhatsApp us

Related Solutions

Related